Roger the Plumber (Lambert) November 3, 2025 Monday
Title
Roger the Plumber (Lambert) November 3, 2025 Monday
Subject
He came to put the new kitchen sink in Alec Levinson's (our tenant) apartment.
Description
It turned out to be a much larger jib than he and I thought it was going to be.<br />
<br />
The pipes leading to the faucets were partly galvanized steel. The steel had to be replaced, which led him down to my studio. Finding the connections and the shut off valve was extremely difficult. He had to shut off the water from the well. Also, I had sculptures and a large drawing and many other things stored in the small room where the pipes were. We had to cover all of this up to protect the work. Roger got very tense and I kept reassuring him that he shoukd just keep working and not to worry it too much. I think it was frustrating for him and he was worrie about how much he would have to chsarge us. Which turned oiut to be quite a bit.
Creator
Harry Roseman
Date
2025-11-03
Collection
Citation
Harry Roseman, “Roger the Plumber (Lambert) November 3, 2025 Monday,” Harry Roseman: A Chronicle, accessed October 3, 2026, https://roseman.vassarspaces.net/items/show/19710.